220 |

Ten-Year Network Development Plan 2017 Main Report

ADVANCED PROJECTS WITH A DIRECT CAPACITY IMPACT

IN THEADVANCED INFRASTRUCTURE LEVEL

*

Code

Name

Country

Commissioning Year

TRA-N-814 Upgrade IP Deutschneudorf and Lasow

Germany

2016

UGS-N-235 Nuovi Sviluppi Edison Stoccaggio

Italy

2017

LNG-N-082 LNG terminal Krk

Croatia

2018

TRA-N-90 LNG evacuation pipeline Omišalj – Zlobin (Croatia)

Croatia

2018

LNG-N-062 LNG terminal in northern Greece/Alexandroupolis – LNG Section

Greece

2018

TRA-N-063 LNG terminal in northern Greece/Alexandroupolis – Pipeline Section

Greece

2018

TRA-N-136 Poland–Czech Republic Interconnection (CZ)

Czech Rep.

2019

TRA-N-273 Poland–Czech Republic interconnection (PL section)

Poland

2019

TRA-N-895 Balticconnector

Estonia

2019

TRA-N-915 Enhancement of Estonia-Latvia interconnection

Estonia

2019

TRA-N-928 Balticconnector Finnish part

Finland

2019

TRA-N-763 EUGAL – Europäische Gasanbindungsleitung (European Gaslink)

Germany

2019

TRA-N-012 GALSI Pipeline Project

Italy

2019

UGS-N-237 Palazzo Moroni

Italy

2019

UGS-N-374 Enhancement of Incukalns UGS

Latvia

2019

TRA-N-341 Gas Interconnection Poland-Lithuania (GIPL) (Lithuania’s section)

Lithuania

2019

TRA-N-212

Gas Interconnection Poland-Lithuania (GIPL)

(PL section)

Poland

2019

TRA-N-275 Poland–Slovakia interconnection (PL section)

Poland

2019

TRA-N-190 Poland–Slovakia interconnection

Slovakia

2019

UGS-N-233 Depomures

Romania

2019

TRA-N-902 Capacity increase at IP Lanžhot entry

Slovakia

2019

TRA-N-752 Capacity4Gas (C4G)

DE/CZ

Czech Rep.

2019

TRA-N-918 Capacity4Gas (C4G)

CZ/SK

Czech Rep.

2019

TRA-N-919 Capacity4Gas (C4G)–CZ/AT

Czech Rep.

2020

TRA-N-021 Bidirectional Austrian–Czech Interconnector (BACI, formerly LBL project)

Austria

2020

TRA-N-133 Bidirectional Austrian Czech Interconnection (BACI)

Czech Rep.

2020

TRA-N-801 Břeclav–Baumgarten Interconnection (BBI) AT

Austria

2020

TRA-N-075 LNG evacuation pipeline Zlobin–Bosiljevo–Sisak–Kozarac

Croatia

2020

LNG-N-079 Paldiski LNG Terminal

Estonia

2020

TRA-N-358 Development on the Romanian territory of the NTS (BG–RO–HU–AT Corridor)

Romania

2020

TRA-N-390 Upgrade of Rogatec interconnection (M1A/1 Interconnection Rogatec)

Slovenia

2020

LNG-N-032 Project GO4LNG LNG terminal Gothenburg

Sweden

2020

TRA-N-808 Transport of gas volumes to the Netherlands

Germany

2021

LNG-N-198 Porto Empedocle LNG

Italy

2021

TRA-N-320 Carregado Compressor Station

Portugal

2021

TRA-N-161 South Transit East Pyrenees (STEP)–ENAGÁS

Spain

2021

TRA-N-252 South Transit East Pyrenees (STEP)–TIGF

France

2022

TRA-N-068 Ionian Adriatic Pipeline

Croatia

2022

Table 6.6:

Advanced projects with a direct capacity impact in the advanced infrastructure level.