Ten-Year Network Development Plan 2017 Main Report |

221

Table 6.7:

Advanced projects without a direct capacity impact in the advanced infrastructure level.

ADVANCED PROJECTS WITHOUT A DIRECT CAPACITY IMPACT

IN THEADVANCED INFRASTRUCTURE LEVEL

*

– Advanced projects requiring an additional less-advanced project to produce a capacity impact

– Internal Advanced projects enabling cross-border capacity development

Code

Name

Country

Commissioning Year

TRA-N-429 Adaptation L-gas – H-gas

France

2018

TRA-N-357 NTS developments in North-East Romania

Romania

2018

TRA-N-361 GCA 2015/08: Entry/Exit Murfeld

Austria

2019

TRA-N-066

Interconnection Croatia – Bosnia and Herzegovina

(Slobodnica – Bosanski Brod)

Croatia

2019

LNG-N-912 Skulte LNG

Latvia

2019

TRA-N-247 North–South Gas Corridor in Western Poland

Poland

2019

TRA-N-423 GCA Mosonmagyaróvár

Austria

2020

TRA-N-801 Břeclav–Baumgarten Interconnection (BBI) AT

Austria

2020

TRA-N-500 L/H Conversion

Belgium 2020

TRA-N-807 Expansion NEL

Germany

2020

TRA-N-010 Poseidon Pipeline

Greece

2020

TRA-N-362 Development on the Romanian territory of the Southern Transmission Corridor

Romania

2020

TRA-N-302 Interconnection Croatia-Bosnia and Herzegovina (South)

Croatia

2021

TRA-N-283

3

rd

IP between Portugal and Spain

(pipeline Celorico–Spanish border)

Portugal

2021

TRA-N-974 LARINO–RECANATI Adriatic coast backbone

Italy

2022

* 

The corresponding Investment Cost are shown in section 4.5.8 of the Infrastructure chapter