Table 6.7:
Advanced projects without a direct capacity impact in the advanced infrastructure level.
ADVANCED PROJECTS WITHOUT A DIRECT CAPACITY IMPACT
IN THEADVANCED INFRASTRUCTURE LEVEL
*
– Advanced projects requiring an additional less-advanced project to produce a capacity impact
– Internal Advanced projects enabling cross-border capacity development
Code
Name
Country
Commissioning Year
TRA-N-429 Adaptation L-gas – H-gas
France
2018
TRA-N-357 NTS developments in North-East Romania
Romania
2018
TRA-N-361 GCA 2015/08: Entry/Exit Murfeld
Austria
2019
TRA-N-066
Interconnection Croatia – Bosnia and Herzegovina
(Slobodnica – Bosanski Brod)
Croatia
2019
LNG-N-912 Skulte LNG
Latvia
2019
TRA-N-247 North–South Gas Corridor in Western Poland
Poland
2019
TRA-N-423 GCA Mosonmagyaróvár
Austria
2020
TRA-N-801 Břeclav–Baumgarten Interconnection (BBI) AT
Austria
2020
TRA-N-500 L/H Conversion
Belgium 2020
TRA-N-807 Expansion NEL
Germany
2020
TRA-N-010 Poseidon Pipeline
Greece
2020
TRA-N-362 Development on the Romanian territory of the Southern Transmission Corridor
Romania
2020
TRA-N-302 Interconnection Croatia-Bosnia and Herzegovina (South)
Croatia
2021
TRA-N-283
3
rd
IP between Portugal and Spain
(pipeline Celorico–Spanish border)
Portugal
2021
TRA-N-974 LARINO–RECANATI Adriatic coast backbone
Italy
2022
*