Ten-Year Network Development Plan 2017 Main Report

6.4.2 COMPETITION BENEFITS

6.4.2.1 Access to supply sources

Already from 2020 the access to supply sources in the advanced infrastructure level

is significantly improved for the Baltic States and Finland. This is thanks to the new

infrastructure ending the isolation for Finland by connecting it with the Baltic States,

the interconnection from Poland towards the Baltic States and the additional LNG

terminals in the area.

On the longer run, the overall deterioration of the diversification situation, resulting

from the EU-wide decline of the indigenous production, is still observed in the

advanced infrastructure level.

Figure 6.35:

SSPDi per country, Green Evolution, whole year, Advanced infrastructure level

0

20

100

80

60

40

%

AT

BA

BE

BG

CH

CZ

DEg

DEn

DK

EE

ES

FI

FR

GR

HR

HU

2020 Advanced

SSPDi-NP

SSPDi-RU

SSPDi-NO

SSPDi-LNG

SSPDi-DZ

SSPDi-LY

SSPDi-AZ

20% threshold

0

20

100

80

60

40

%

AT

BA

BE

BG

CH

CZ

DEg

DEn

DK

EE

ES

FI

FR

GR

HR

HU

2030 Advanced

SSPDi-NP

SSPDi-RU

SSPDi-NO

SSPDi-LNG

SSPDi-DZ

SSPDi-LY

SSPDi-AZ

20% threshold