Background Image
Table of Contents Table of Contents
Previous Page  55 / 232 Next Page
Information
Show Menu
Previous Page 55 / 232 Next Page
Page Background

Ten Year Network Development Plan 2015 |

55

-150

-50

50

150

350

250

%

Final (res., com., ind.)

Power generation

GR

29%

0%

HR

26%

36%

HU

8%

156%

IE

1%

67%

IT

-3%

9%

LT

-10%

178%

LU

5%

136%

LV

20%

123%

MK

8%

-22%

MT

0%

NL

-27%

85%

PL

16%

520%

PT

24%

99%

RO

29%

133%

RS

99%

180%

SE

26%

-100%

SI

15%

3%

SK

8%

71%

UK

-25%

-13%

-150

-50

50

150

350

250

%

Final (res., com., ind.)

Power generation

GR

29%

156%

HR

26%

-57%

HU

8%

-12%

IE

1%

51%

IT

-1%

28%

LT

-10%

18%

LU

5%

31%

LV

-10%

118%

MK

8%

-22%

MT

0%

NL

-17%

154%

PL

16%

79%

PT

15%

426%

RO

29%

307%

RS

99%

180%

SE

13%

-100%

SI

15%

SK

8%

542%

UK

-10%

70%

4.3.2.4 Winter and summer averages

The modelling assessment differentiates between average summer and average

winter conditions. The demand data for these climatic cases has been derived from

the annual demand information provided by TSO assuming:

\\

No differentiation between the daily average gas demand for power generation

in summer and winter.

\\

A “winter average factor” specific to each country is calculated as the devia-

tion of the winter average demand from the yearly average demand.