Ten Year Network Development Plan 2015 |
55
-150
-50
50
150
350
250
%
Final (res., com., ind.)
Power generation
GR
29%
0%
HR
26%
36%
HU
8%
156%
IE
1%
67%
IT
-3%
9%
LT
-10%
178%
LU
5%
136%
LV
20%
123%
MK
8%
-22%
MT
0%
∞
NL
-27%
85%
PL
16%
520%
PT
24%
99%
RO
29%
133%
RS
99%
180%
SE
26%
-100%
SI
15%
3%
SK
8%
71%
UK
-25%
-13%
-150
-50
50
150
350
250
%
Final (res., com., ind.)
Power generation
GR
29%
156%
HR
26%
-57%
HU
8%
-12%
IE
1%
51%
IT
-1%
28%
LT
-10%
18%
LU
5%
31%
LV
-10%
118%
MK
8%
-22%
MT
0%
∞
NL
-17%
154%
PL
16%
79%
PT
15%
426%
RO
29%
307%
RS
99%
180%
SE
13%
-100%
SI
15%
∞
SK
8%
542%
UK
-10%
70%
4.3.2.4 Winter and summer averages
The modelling assessment differentiates between average summer and average
winter conditions. The demand data for these climatic cases has been derived from
the annual demand information provided by TSO assuming:
\\
No differentiation between the daily average gas demand for power generation
in summer and winter.
\\
A “winter average factor” specific to each country is calculated as the devia-
tion of the winter average demand from the yearly average demand.