Ten-Year Network Development Plan 2017 Main Report |
181
6.3 Assessment of reasonable
infrastructure needs and
investment gaps
The low infrastructure level
1)
is the basis for the
identification of priority areas facing an investment
gap. It consists of the existing infrastructure and the
FID projects
2)
. 34 FID projects have been submitted
for this TYNDP edition.
The following Table 6.1 and Table 6.2 list those projects
3)
. The FID projects repre-
sent an overall investment cost of 27.5 bn€
4)
. It incorporates large scale projects for
which costs have been publicly reported (Nord Stream 2 around 8bn€, TANAP
around 10bn$, TAP around 6 bn€) which represent a large share of the overall costs
of FID projects.
FID PROJECTS WITH A DIRECT CAPACITY
IMPACT IN THE LOW INFRASTRUCTURE LEVEL
Code
Name
Country
Commissioning
Year
TRA-F-241 MONACO section phase I (Burghausen-Finsing)
Germany
2017
TRA-F-291 NOWAL – Nord West Anbindungsleitung
Germany
2017
TRA-F-768 Extension Receiving Terminal Greifswald
Germany
2017
LNG-F-147 Revythoussa (2
nd
upgrade)
Greece
2017
TRA-F-137 Interconnection Bulgaria – Serbia
Bulgaria
2018
TRA-F-378 Interconnector Greece-Bulgaria (IGB Project)
Bulgaria
2018
TRA-F-43 Val de Saône project
France
2018
TRA-F-331 Gascogne Midi
France
2018
TRA-F-208 Reverse Flow TENP Germany
Germany
2018
TRA-F-214 Support to the North West market and bidirectional cross-border flows
Italy
2018
TRA-F-45 Reverse capacity from CH to FR at Oltingue
France
2018
TRA-F-230 Reverse Flow Transitgas Switzerland
Switzerland 2018
TRA-F-221 TANAP – Trans Anatolian Natural Gas Pipeline Project
Turkey
2018
TRA-F-051 Trans Adriatic Pipeline
Greece
2019
UGS-F-1045 Bordolano Second phase
Italy
2019
UGS-F-260 System Enhancements – Stogit – on-shore gas fields
Italy
2026
LNG-F-178 Musel LNG terminal
Spain
2026
1) Also see the infrastructure chapter, section 4.4.2
2) See Annex A
3) The 3 following projects were already commissioned by end 2016, and are therefore not reported in the table:
Bordolano First Phase
(UGS-F-259),
Romania –Bulgaria Interconnection
(TRA-F-029) and
Exit Capacity Budince
(TRA-F-1047)
4) ENTSOG has committed towards promoters to keep the individual project costs confidential
Table 6.1:
FID projects with a direct capacity impact in the low infrastructure level